Select Service
#13Energy Visibility
Rack overprovisioning audit
Audit and flag racks with overprovisioned power/cooling, prioritizing for hardware repurpose or contract renegotiation. Per Helios RackOverprovisioningInput schema.
Configure Parameters
Unique identifier for the data center facility
Unique identifier for rack
ISO8601 UTC timestamp. Freshness requirement: < 5 min latency
Provisioned power limit per rack from DCIM/BMS
IT load average over last 1h from Prometheus
Installed cooling capacity from site plan/CSV
Provisioning/growth/resilience policy
Sensor overlay for rack
Airflow rate if available
Enhance with Documents(Optional)
Upload facility specs, equipment data, or operational logs to improve analysis accuracy
Upload Context Documents
Drag and drop files or click to browse
Supported: TXT, CSV, JSON, Markdown, PDF, Excel (max 10MB each)
